A Building Permit (PBG) and a Certificate of Functionality Compliance (SLF) are crucial documents for any construction project in Indonesia. They ensure that a building meets all required standards and is safe for operation. Our company specializes in helping you obtain these documents quickly and efficiently, minimizing delays every step of the way.
Building Permit (PBG)A Building Permit (PBG) is a mandatory authorization required before starting any construction project. It applies to individuals or entities planning to construct new buildings, as well as those undertaking modifications or expansions of existing structures. Without this permit, construction cannot legally begin, and the project risks being stopped by law enforcement.
Certificate of Functionality Compliance (SLF)The SLF certifies that a building meets all required functional standards for safe operation. It is issued by regional authorities after the construction is completed. Without this certificate, the building cannot be legally used.
A PBG is mandatory before starting construction; without it, work cannot begin.
An SLF is issued after construction is completed, certifying that the building meets all operational standards.
Residential buildings: SLF is valid for 20 years.
Commercial buildings: SLF is valid for 5 years.
Step 1: Begin the Process
1. Preparing the Information
Provide Project Information: Share the exact location of your project, including a Google Maps link for reference.
Submit Building Plans: Provide detailed 2D and 3D drawings of the building for analysis by our specialists.
Receive a Price Proposal: After reviewing your submitted data, our specialists will provide a detailed price proposal.
Schedule a Consultation:If you have questions or need further clarification, you can arrange a free meeting with our experts. Meetings must be scheduled at least 2 days in advance.
Step 2: Obtaining a Building Permit (PBG)
Verification of Building Codes and Regulations
We will ensure the project complies with relevant building codes based on its zoning.
We will collect the required non-technical documentation, including:
Land Certificate (SHM)
Taxpayer Identification Numbers (NPWP and NPWPD)
CLO (Certificate of Electrical Equipment Operation)
Documentation Adjustment
If needed, our specialists will assist in revising the project's technical documentation.
Data Submission to the System
After collecting and verifying all necessary data, it will be uploaded into the system for review.
A team of experts will conduct an inspection. If approved, you will be required to pay the tax levy (SKRD).
Upon payment, you will receive a temporary building permit, allowing you to begin construction.
Construction Stages and Inspections
Construction will be monitored in three stages:
Stage 1: Inspection of foundation
Stage 2: Inspection of completed walls and beams
Stage 3: Roof installation inspection
Each stage requires reporting, and inspections will be carried out at every stage.
Final Permit
After all inspections are completed, you will receive the original PBG.
PBG Processing TimeThe process usually takes 3.5 to 4 months, depending on system performance and the completeness of the data. Delays may arise due to queues. We will keep you updated weekly to ensure you're informed about the progress.
SLF Certification Process
1. Drawing Preparation
We will prepare the necessary technical drawings required for certification.
2. Material Testing
Materials such as MR and steel will undergo thorough testing to meet certification standards.
3. On-Site Inspection
The SLF team will conduct an on-site inspection. Any discrepancies identified during the inspection will be addressed and corrected.
4. Payment of SKSD Tax and Certification
Once corrections (if required) are made and the inspection is successfully passed, you will pay the SKSD tax. After payment, the SLF certificate will be issued.
Why Choose Us?
Comprehensive Services
We assist you in obtaining all the necessary permits and certifications for your project, simplifying the entire process.
Transparency and Reliability
We provide clear communication and oversight at every stage, ensuring you’re always informed about the current status of your project.
Qualified Team
Our team of seasoned experts has successfully managed a wide range of projects and is committed to ensuring flawless documentation, helping you save time, avoid costly errors, and streamline the approval process.
Don’t delay your construction matters! Contact us today to learn more or to begin the process of securing permits and certifications for your building.